Abstract
This Meta EIP lists the EIPs formally Proposed, Considered, Scheduled & Declined for Inclusion in the Fulu/Osaka network upgrade.
Specification
Definitions for Scheduled for Inclusion
, Considered for Inclusion
, Proposed for Inclusion
and Declined for Inclusion
can be found in EIP-7723.
EIPs Scheduled for Inclusion
Core EIPs
- EIP-7594: PeerDAS - Peer Data Availability Sampling
- EIP-7823: Set upper bounds for MODEXP
- EIP-7825: Transaction Gas Limit Cap
- EIP-7883: ModExp Gas Cost Increase
- EIP-7917: Deterministic proposer lookahead
- EIP-7918: Blob base fee bounded by execution cost
- EIP-7934: RLP Execution Block Size Limit
- EIP-7935: Set default gas limit to XX0M
- EIP-7939: Count leading zeros (CLZ) opcode
- EIP-7951: Precompile for secp256r1 Curve Support
Other EIPs
- EIP-7892: Blob Parameter Only Hardforks
- EIP-7642: eth/69 - Drop pre-merge fields
- Client teams MUST support this EIP by the activation of the Fusaka network upgrade.
- EIP-7910: eth_config JSON-RPC Method
- Client teams MUST support this JSON RPC method by the activation of Fusaka network upgrade.
Activation
Network Name |
Activation Epoch |
Activation Timestamp |
Holešky |
|
|
Sepolia |
|
|
Hoodi |
|
|
Mainnet |
|
|
Note: rows in the table above will be filled as activation times are decided by client teams.
Rationale
This Meta EIP provides a global view of all changes included in the Fusaka network upgrade, as well as links to full specification.
Security Considerations
None.
Copyright
Copyright and related rights waived via CC0.